Putting It All Together (Reading a Program Schedule)

The sixth of six videos in the Reading a Program Schedule series. Describes a simple process to breakdown and understand any program schedule, even if it contains thousands of tasks.

From  Chad Reynolds 0 likes 562 plays 0  

Schedule Status (Reading a Program Schedule)

The fifth of six videos in the Reading a Program Schedule series. Describes how to determine if a task is ahead or behind its current schedule and if a task has slipped or improved from its baseline…

From  Chad Reynolds 0 likes 118 plays 0  

Critical Path (Reading a Program Schedule)

The fourth of six videos in the Reading a Program Schedule series. Describes the definition of and how to identify a Critical Path.

From  Chad Reynolds 0 likes 158 plays 0  

Schedule Float (Reading a Program Schedule)

The third of six videos in the Reading a Program Schedule series. Describes the schedule metric Total Float.

From  Chad Reynolds 0 likes 572 plays 0  

A Networked Schedule (Reading a Program Schedule)

The second of six videos in the Reading a Program Schedule series. Describes how every task in a network schedule is tied to at least one other task.

From  Chad Reynolds 0 likes 184 plays 0  

Schedule Building Blocks (Reading a Program Schedule)

The first of six videos in the Reading a Program Schedule series. Describes the three elements that define a Discrete Task.

From  Chad Reynolds 0 likes 645 plays 0  

How Much? Tailoring (Placing EVM on Contract)

The fifth of five videos in the Placing EVM on Contract series. Describes how the IPMDAR CDRL should be tailored to meet the needs of every program.

From  Chad Reynolds 0 likes 586 plays 0  

What? The IPMDAR (Placing EVM on Contract)

The fourth of five videos in the Placing EVM on Contract series. Describes the three components of the IPMDAR (Integrated Program Management Data and Analysis Report).

From  Chad Reynolds 0 likes 819 plays 0  

How? Contract Structure (Placing EVM on Contract)

The third of five videos in the Placing EVM on Contract series. Describes the EVM DFARS clauses and CDRL requirements that must be placed on contract when EVM reporting is required.

From  Chad Reynolds 0 likes 622 plays 0  

When? EVM Applicability (Placing EVM on Contract)

The second of five videos in the Placing EVM on Contract series. Describes the four step process to determine if EVM reporting requirements are required on a DoD contract.

From  Chad Reynolds 0 likes 697 plays 0  

Why? The Value of Earned Value (Placing EVM on Contract)

The first of five videos in the Placing EVM on Contract series. Describes how EVM can be used as a risk management tool.

From  Chad Reynolds 0 likes 631 plays 0  

PV, EV and AC (Understanding EVM Basics)

The third of three videos in the Understanding EVM Basics series. Dana explains to Jim the three fundamental EVM variables: Planned Value (PV), Earned Value (EV) and Actual Cost (AC).

From  Chad Reynolds 0 likes 309 plays 0  

IBR Timeline (Conducting an IBR)

The fourth of four videos in the Conducting an IBR series. Describes the two phases of the IBR and provides an overall notional timeline.

From  Chad Reynolds 0 likes 216 plays 0  

IBR Documentation (Conducting an IBR)

The third of four videos in the Conducting an IBR series. Describes the documentation which supports an IBR.

From  Chad Reynolds 0 likes 647 plays 0  

Control Account Managers (Conducting an IBR)

The second of four videos in the Conducting an IBR series. Describes the relationship between Control Account Managers (CAMs) and Government Functional Leads.

From  Chad Reynolds 0 likes 279 plays 0  

Contract Risk Assessment (Conducting an IBR)

The first of four videos in the Conducting an IBR series. Covers the five risk areas assessed during an Integrated Baseline Review.